Improve mobility and connectivity for people who walk, bike, use transit, and drive. 

Lead for Construction: City of Durham Public Works

Lead for Design: City of Durham Transportation

Design Contractors: Kittleson & Associates and Three Oaks Engineering

Scroll down for upcoming engagement events and sign up for updates! Project Description

The City of Durham will resurface Oak Grove Parkway from Wake Forest Highway (NC 98) to Stallings Road (approximately 1.18 miles). Resurfacing helps improve and preserve current roadway pavement conditions. 

During this process, the City can adjust current pavement marking designs on the road and install traffic calming features to increase safety for all road users. For example, on some roads, you can improve or add painted bike lanes and crosswalks, but this project will not allow you to address needs beyond the width of the road, such as building a new sidewalk. 

This roadway resurfacing design project will develop pavement marking designs that the City will install after construction. The designs will be based on current conditions and community input.

Funding

Planning and design for the Oak Grove Parkway roadway resurfacing project is City-funded through the Capital Improvement Plan.

Map of Oak Grove Parkway Roadway Resurfacing project limits. The map shows gray streets on a white b

Project map note: project limits are highlighted in yellow with start and end points labeled in blue. Key points of interest are noted with red stars.

PROJECT SCHEDULE
  • Engagement: March - May 31, 2024
  • Anticipated Design Completion: July 2024
  • Construction: Due to weather, the City of Durham pavement marking construction season goes from May through November. Construction is anticipated to begin and be completed between these months. For more information regarding construction, visit Public Works Street Repaving. 
Project Schedule Status

A design team - Kittleson & Associates and Three Oaks Engineering - was hired by the City of Durham to conduct field investigation and traffic analyses, develop design plans, and hold engagement meetings with the public. City staff kicked off the project in January. The design team is currently collecting data and assisting the City with planning public engagement activities. The City will begin holding public open houses in March 2024.

community engagementEngagement graphic with arrow to the left

City staff will host a public open house and pop-up events to discuss possible pavement marking changes for Oak Grove Pkwy. Planners and engineers will attend these events to explain the work, gather feedback, and answer questions.

Interactive Comment Map

Submit Oak Grove Pkwy. comments on this interactive web map by 5/31/2024.

Oak Grove Pkwy Map Screenshot

Public Comment SurveyOpen Houses 

The public can drop in at any time during the scheduled open house event. A Spanish interpreter will be present. Other language assistance services will be accessible by phone. Please contact [email protected] if other language assistance is needed.  

LocationDateTimeEast Regional Library, East Meeting Room (211 Lick Creek Ln)Tuesday, March 19, 20245:30 PM to 7:00 PMPop-Up Events

The public can drop by anytime during the scheduled pop-up events. A Spanish interpreter and other language assistance services will be accessible by phone at all pop-up events. Please contact [email protected] if other language assistance or accommodations are needed.

LocationDateTimeEarth Day Festival, Transportation Expo (Central Park, 501 Foster St)Sunday, April 21, 2024 9:00 AM to 6:00 PMBimbé Cultural Arts Festival (Rock Quarry Park, 701 Stadium Dr)Saturday, May 18, 20241:00 PM to 7:00 PM